Rancho El Chonete
Limited Memberships

Telegram: (506)8753-6414
Office USA: (303)731-3387
Office-Solo Español: (506)2475-7275
Office Pakistan: (9233)3559-1948

Rancho El Chonete

Telegram: (506)8753-6414
Office USA: (303)731-3387
Office-Solo Español: (506)2475-7275
Office Pakistan: (9233)3559-1948

Current Development

Rancho El Chonete's Vision - Ranch Layout Renderings
Ground Breaking Development Well Under Way...
Jacuzzi, Storage Room, Ramp for Wheelchairs

In this video, you can see the tunnels being created right now, jacuzzi area, and the entrance. When you’re down in the tunnel walking down to the jacuzzi, on my left you’ll see a square cut out that’s going to be a storage room. You’ll walk out of the tunnel on the left and there will be a ramp for wheelchairs going up right there by the post. In the middle will be flowers and possibly a water fixture. Then there will be steps going up where you walk outso people coming out of the Jacuzzi can go right to the store to buy whatever they need. It’s a pretty nice setup.

Play Video
Play Video
The Sanctuary Under Development

Here we are working on putting in the drain in the sanctuary. The sanctuary is going to be an underground Jacuzzi Pacino. We’re going to obviously secure up these walls as the Jacuzzi is coming in within the next few days. There’s the new office off in the background as well. You’re going to be pretty amazed of what you see here.

Holistic Massage Center & More...

You can see here we’ve got our tunnel in the Jacuzzi staked out. Saving a lot of money by putting in the drain this way. That’s a holistic massage center. It’s gonna be underground. And when the tunnel comes out disabled people and people of all shapes and sizes will be able to Join. The thrill entering off the back corner of the office which is still slightly under construction.

Play Video
Platform for Juccuzzi & Lighting

We’ve got the top is designed and we’ve got the cable run for the lights. We’re putting the mesh in right now for the concrete. These posts are ready to be poured.

We’re getting the cuts for the concrete frame for the tunnel and the tunnels growing. There’ll be a light in the back of the seat that we’re going to form in that’ll get concreted up shortly. Then the only thing left to do is complete the final stairs once we get the pots. We’ll put the stairs in and then continue working on the tunnel.

This platform and the jacuzzi will be concreted so it’ll be sturdy. Those are gonna to be finished and concreted as soon as we get these posts in.

Play Video
A Live Look at Current Development:
Further Development Plans in the Works
Secret Hot Springs

Find out more about this ground breaking opportunity:

0
INVESTMENT OPPORTUNITY